Cracks, uneven settling gaps between steps, and water damage to the rooms below the steps — be gone! All granite steps have been removed, cataloged, and cleaned or replaced, and the Facilities team is in the process of repairing the underlying structure, repairing steel below the steps, installing waterproofing, and adding new bronze handrails. Notably, right now, the brick pathway nearest to the front of Low is being reconstructed as a more level and water-draining surface, which has rerouted traffic in front of the building as a whole.
You can keep up-to-date with the work that Facilities and Operations is doing here, but scroll through the photos below to get a closer look at what is happening.
"low" - Google News
July 11, 2022 at 08:28PM
https://ift.tt/Vgn1afH
What's Happening at the Iconic Low Library Steps? 6 Photos Tell the Restoration Story - Columbia University
"low" - Google News
https://ift.tt/g5AeRJn
Bagikan Berita Ini
0 Response to "What's Happening at the Iconic Low Library Steps? 6 Photos Tell the Restoration Story - Columbia University"
Post a Comment